FERN RD BRIDGE PILE ENCAPSULATION PROJECT – CANNING RIVER, WA

Shorewater Marine’s divers assisted Fortech Australia with the rehabilitation of the Fern Rd Bridge timber pylons in the Canning River.

 

The works included but not limited to:

 

- The application of Denso Seashield pile protection systems; installed to provide protection to the timber piles against deleterious marine organisms

- The application of the PileJax pile encapsulation system, to strengthen existing bridge timber pylons, increasing the structures durability and lifespan.

 

- The project involved preliminary works installing vertical PFC Channel bracing at quarter points around the outside diameter of the pile, prior to the application of the PileJax system.