top of page
HILLARYS BOAT HARBOUR DEMOLITION & INSTALLATION OF PORALU FLOATING PEN SYSTEMS
– HILLARYS, WA
Client: The Department of Transport
Shorewater Marine was engaged to complete the demolition and disposal of existing Jetties B and C within the Hillarys Boat Harbour, and the design and construction of three new floating jetties, named B0, B and C Jetty, with new gangways connected to the existing A Jetty.
The works included but were not limited to:
- Demolition and disposal of existing jetties B and C
- Design and construct new jetties B0, B and C
- Construct new gangway system connected to the existing a Jetty
- 6 & 12 month inspections
- Detailed reporting
1/1
bottom of page