top of page

HILLARYS BOAT HARBOUR DEMOLITION & INSTALLATION OF PORALU FLOATING PEN SYSTEMS 

 – HILLARYS, WA

Client: The Department of Transport

Shorewater Marine was engaged to complete the demolition and disposal of existing Jetties B and C within the Hillarys Boat Harbour, and the design and construction of three new floating jetties, named B0, B and C Jetty, with new gangways connected to the existing A Jetty.

The works included but were not limited to:

- Demolition and disposal of existing jetties B          and  C

- Design and construct new jetties B0, B and C

- Construct new gangway system connected to      the existing a Jetty

- 6 & 12 month inspections

- Detailed reporting

bottom of page