top of page
TWO ROCKS MARINA; DEMOLITION, DESIGN, CONSTRUCTION & INSTALLATION OF JETTIES P & R
– TWO ROCKS MARINA WA
Client: The Department of Transport
Shorewater Marine was engaged to carry out demolition, design, construction and installation works at the Two Rocks Marina.
The works included but were not limited to
- The demolition and pile removal of the existing P Jetty
- Design Poralu floating pontoon systems and gangway for jetties P and R
- Construct and install the Poralu floating pontoon systems
- Provide 6 and 12 month inspections
- Detailed reporting
1
2
5
1
1/5
bottom of page