top of page

FREMANTLE BRIDGE PILE ENCAPSULATION PROJECT
– FREMANTLE, WA

Client: Main Roads Western Australia

Shorewater marine successfully completed the repair of the Fremantle Traffic Bridge timber pylons. 

 

Works Conducted but not limited to:

- Subsea inspection for deleterious materials      and organisms. 

- Removal of redundant pile encapsulation        systems

- High pressure cleaning of piles

- Fit & install piles with steel reinforcements 

- Inspection and  detailed reporting

bottom of page