AUGUSTA BOAT HARBOUR CONSTRUCTION – AUGUSTA, WA
Client: Swan Marine Contracting
Shorewater Marine was engaged to complete a number of below water and above water tasks for the construction of the Augusta Boat Harbour.
The works included but were not limited to:
- Seabed excavation,
- Below water level Inspections
- Rock removal
- Assistance with the construction of jetty systems, boat ramp construction
- Detailed reporting.
![](https://static.wixstatic.com/media/799ea5_d4b0c9ba1bf24f2488c07b9814394a01~mv2.jpg/v1/fill/w_147,h_110,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/799ea5_d4b0c9ba1bf24f2488c07b9814394a01~mv2.jpg)
![](https://static.wixstatic.com/media/799ea5_0d022d63721f46e2b86f09d7a8a08666~mv2.jpg/v1/fill/w_115,h_86,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/799ea5_0d022d63721f46e2b86f09d7a8a08666~mv2.jpg)
![](https://static.wixstatic.com/media/799ea5_d4b0c9ba1bf24f2488c07b9814394a01~mv2.jpg/v1/fill/w_147,h_110,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/799ea5_d4b0c9ba1bf24f2488c07b9814394a01~mv2.jpg)
1/2
bottom of page